Archive | Main Library RSS feed for this section

Maintenance Costs and Reform

April 5, 2009

4 Comments

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques. In Scotland last year a group of coatings manufacturers estimated the coatings maintenance market was $2 Billion Dollars. The estimation for coatings going over water jetting surfaces was 510%. While all [...]

Continue reading...

UHP Equipment

April 5, 2009

0 Comments

A Primary Mission of the Council is to promote effective means of surface preparation in the maintenance industry using water and water/abrasive blasting techniques. Operating conditions, cleaning rates, and performance differ substantially from standard equipment with several significant advantages applicable in todays environmentally and safety- conscious society. Early in 1971, the first ultrahigh-pressure compact intensifier [...]

Continue reading...

Benchmark Cost Study

April 5, 2009

1 Comment

A 1975 benchmark study by Battelle-NBS calculated the cost of corrosion to be $70 billion per year, which was 4.2 percent of the nation’s gross national product (GNP). In this study, the total direct cost of corrosion was determined by analyzing 26 industrial sectors in which corrosion is known to exist and extrapolating the results [...]

Continue reading...

UHP Standards and Parameters

April 5, 2009

0 Comments

The purpose of NSRP Project 3-96-4 was to evaluate the productivity of and areas of hydroblast (water-jetting) removal of coatings on representative areas of a ship, such as the hull, non-skid decking areas, tanks, complex geometry using open and closed loop systems. These procedures include surface cleanliness, surface contamination, coating removal rates, visual appearance, flash [...]

Continue reading...

Blistering on Panels

April 5, 2009

0 Comments

Neither the United States, nor the Maritime Administration, nor any person acting on behalf of the Maritime Administration, (A) makes any warranty or representation, expressed or implied, with respect to the accuracy, completeness or usefulness of the information contained in this report/ manual, or that the use of any information, apparatus, method, or process disclosed [...]

Continue reading...

Baseline Measurements and Risk Factors

April 5, 2009

0 Comments

·Atlantic Marine Holding Company – (Prime Contractor) Will contribute shipyard resources and shipyard facility. · Worker fatigue induced by activities involving prolonged and repetitive use of heavy tools and equipment ·Discharge of water (process and storm water) contaminated with heavy metals into adjacent waterways and onto adjacent property via storm drains and into the ground [...]

Continue reading...